Fort Duncan BESS (23INR0350)

Fort Duncan BESS is a 106.2 MW other interconnection project in Maverick, Texas with a current status of suspended. It is proposed to connect at 78015 Rosita Creek ROSICR 138kV_x000D_ will be at the new LCRA_x000D_ TSC Sunglow Substation.

106.2 MWCapacity
SuspendedStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameFort Duncan BESS
Queue ID23INR0350
Statussuspended
Source statussuspended
MarketERCOT
TechnologyOther
Capacity106.2 MW
StateTexas
CountyMaverick
Point of interconnection78015 Rosita Creek ROSICR 138kV_x000D_ will be at the new LCRA_x000D_ TSC Sunglow Substation
Requested (queue) date2021-08-16
Proposed in-service date2025-06-19
Operational date2025-06-25
Withdrawn date
DeveloperFort Duncan BESS, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata