Fort Thompson - Huron 230 kV Tap (GEN-2023-154)

Fort Thompson - Huron 230 kV Tap is a 175.0 MW solar interconnection project in Hand, South Dakota with a current status of withdrawn. It is proposed to connect at Fort Thompson - Huron 230 kV Tap.

175.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameFort Thompson - Huron 230 kV Tap
Queue IDGEN-2023-154
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity175.0 MW
StateSouth Dakota
CountyHand
Point of interconnectionFort Thompson - Huron 230 kV Tap
Requested (queue) date2023-10-02
Proposed in-service date2029-09-30
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata