Fox Run Energy Storage (25INR0210)

Fox Run Energy Storage is a 301.4 MW other interconnection project in Jones, Texas with a current status of withdrawn. It is proposed to connect at Kirchhoff Substation (PTI#60704).

301.4 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameFox Run Energy Storage
Queue ID25INR0210
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity301.4 MW
StateTexas
CountyJones
Point of interconnectionKirchhoff Substation (PTI#60704)
Requested (queue) date2023-02-19
Proposed in-service date2026-07-01
Operational date
Withdrawn date2024-02-21
DeveloperFox Run Energy Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata