Gerald Gentleman 345kV switchyard is a 400.0 MW solar interconnection project in Lincoln, Nebraska with a current status of withdrawn. It is proposed to connect at Gerald Gentleman 345kV switchyard.

400.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameGerald Gentleman 345kV switchyard
Queue IDGEN-2018-066
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity400.0 MW
StateNebraska
CountyLincoln
Point of interconnectionGerald Gentleman 345kV switchyard
Requested (queue) date2018-10-24
Proposed in-service date
Operational date
Withdrawn date2019-04-16
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata