Lincoln County, Nebraska — Interconnection Projects
The interXdata warehouse tracks 20 interconnection projects in Lincoln, Nebraska, representing 4,671 MW of requested capacity.
20Total projects
2Active
7Operational
11Withdrawn
4,671 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 8 | 2,280 MW |
| Other | 6 | 1,410 MW |
| Wind | 4 | 751 MW |
| Battery | 1 | 225 MW |
| Gas | 1 | 5 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Gerald Gentleman | 6077_1 | Other | 681.3 MW | operational | Lincoln, Nebraska |
| Gerald Gentleman | 6077_2 | Other | 681.3 MW | operational | Lincoln, Nebraska |
| Gerald Gentleman-Red Willow 345kV transmssion line | GEN-2019-007 | Solar | 500.0 MW | withdrawn | Lincoln, Nebraska |
| Gerald Gentleman 345kV switchyard | GEN-2018-066 | Solar | 400.0 MW | withdrawn | Lincoln, Nebraska |
| Gerald Gentleman-Red Willow 345kV line break | GEN-2022-198 | Solar | 300.0 MW | withdrawn | Lincoln, Nebraska |
| Gerald Gentleman-Red Willow 345kV line | GEN-2021-060 | Wind | 300.0 MW | withdrawn | Lincoln, Nebraska |
| Tap on the Sweetwater to Gerald Gentleman 345 kV Line | GEN-2021-073 | Solar | 240.0 MW | withdrawn | Lincoln, Nebraska |
| New GGS Satellite 345 kV Substation | GEN-2022-210 | Solar | 240.0 MW | withdrawn | Lincoln, Nebraska |
| New switching station on Gentleman to Sweetwater 345kV line | GEN-2018-125 | Wind | 231.0 MW | active | Lincoln, Nebraska |
| Wagener 115kV Substation | GEN-2026-SR20 | Battery | 225.0 MW | active | Lincoln, Nebraska |
| New GGS Satellite 345 kV Substation | GEN-2022-212 | Solar | 225.0 MW | withdrawn | Lincoln, Nebraska |
| Line side tap using three breaker ring bus on 230kV Feeder from Gerald Gentleman to North Platte | GEN-2021-105 | Solar | 200.0 MW | withdrawn | Lincoln, Nebraska |
| New GGS Satellite 345 kV Substation | GEN-2022-211 | Solar | 175.0 MW | withdrawn | Lincoln, Nebraska |
| Gerald Gentleman-Red Willow 345kV line break | GEN-2022-187 | Wind | 120.0 MW | withdrawn | Lincoln, Nebraska |
| GEN-2006-038N012 | GEN-2006-038N012 | Wind | 100.0 MW | withdrawn | Lincoln, Nebraska |
| North Platte | 2274_1 | Other | 13.1 MW | operational | Lincoln, Nebraska |
| North Platte | 2274_2 | Other | 13.1 MW | operational | Lincoln, Nebraska |
| Jeffrey | 2227_1 | Other | 10.8 MW | operational | Lincoln, Nebraska |
| Jeffrey | 2227_2 | Other | 10.8 MW | operational | Lincoln, Nebraska |
| Terry Bundy Generating Station 115kV | GEN-2012-021 | Gas | 4.8 MW | operational | Lincoln, Nebraska |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.