Gerald Gentleman-Red Willow 345kV line break (GEN-2022-198)

Gerald Gentleman-Red Willow 345kV line break is a 300.0 MW solar interconnection project in Lincoln, Nebraska with a current status of withdrawn. It is proposed to connect at Gerald Gentleman-Red Willow 345kV line break.

300.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameGerald Gentleman-Red Willow 345kV line break
Queue IDGEN-2022-198
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity300.0 MW
StateNebraska
CountyLincoln
Point of interconnectionGerald Gentleman-Red Willow 345kV line break
Requested (queue) date2023-02-28
Proposed in-service date2028-12-15
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata