GIRALDA SOLAR (26INR0224)
GIRALDA SOLAR is a 137.3 MW solar interconnection project in Van Zandt, Texas with a current status of withdrawn. It is proposed to connect at Tap 345kV 3105 ELKTON_5 --- 3100 MARTINLK_5_x000D_ .
137.3 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | GIRALDA SOLAR |
|---|---|
| Queue ID | 26INR0224 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 137.3 MW |
| State | Texas |
| County | Van Zandt |
| Point of interconnection | Tap 345kV 3105 ELKTON_5 --- 3100 MARTINLK_5_x000D_ |
| Requested (queue) date | 2023-09-21 |
| Proposed in-service date | 2026-12-25 |
| Operational date | — |
| Withdrawn date | 2023-12-19 |
| Developer | BLUE STONE RENEWABLE XXI LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata