Gold Creek Solar (19INR0167)

Gold Creek Solar is a 140.0 MW solar interconnection project in Dawson, Texas with a current status of withdrawn. It is proposed to connect at 1163 Lamesa 138kV.

140.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameGold Creek Solar
Queue ID19INR0167
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity140.0 MW
StateTexas
CountyDawson
Point of interconnection1163 Lamesa 138kV
Requested (queue) date2018-05-03
Proposed in-service date2021-12-15
Operational date
Withdrawn date2020-09-10
DeveloperS&R SOLAR DESIGN CORP
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.