GOLDEN EVENING SOLAR (1328)

GOLDEN EVENING SOLAR is a 312.2 MW solar interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at SCE Whirlwind Substation.

312.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGOLDEN EVENING SOLAR
Queue ID1328
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity312.2 MW
StateCalifornia
CountyKern
Point of interconnectionSCE Whirlwind Substation
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2017-03-10
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata