Goldeneye II BESS (25INR0158)

Goldeneye II BESS is a 100.8 MW other interconnection project in Bell, Texas with a current status of withdrawn. It is proposed to connect at 3423 KILLEEN SS.

100.8 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameGoldeneye II BESS
Queue ID25INR0158
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity100.8 MW
StateTexas
CountyBell
Point of interconnection3423 KILLEEN SS
Requested (queue) date
Proposed in-service date2025-04-15
Operational date
Withdrawn date2022-08-31
DeveloperBlack Mountain Energy Storage II
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata