Goodnight Wind (14INR0033)

Goodnight Wind is a 258.1 MW wind interconnection project in Armstrong, Texas with a current status of operational. It is proposed to connect at tap 345kV 79500 Alibates - 79503 Tule Canyon CKT2.

258.1 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameGoodnight Wind
Queue ID14INR0033
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity258.1 MW
StateTexas
CountyArmstrong
Point of interconnectiontap 345kV 79500 Alibates - 79503 Tule Canyon CKT2
Requested (queue) date2012-07-23
Proposed in-service date2024-04-11
Operational date2024-04-08
Withdrawn date
DeveloperFGE Goodnight II, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata