Grand Acres is a 153.0 MW solar interconnection project in Cameron, Texas with a current status of withdrawn. It is proposed to connect at 8359 South Santa Rosa 138 kV.

153.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameGrand Acres
Queue ID23INR0374
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity153.0 MW
StateTexas
CountyCameron
Point of interconnection8359 South Santa Rosa 138 kV
Requested (queue) date2021-10-06
Proposed in-service date2027-02-23
Operational date
Withdrawn date2025-07-15
DeveloperFronton Solar 1
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata