Green Holly Solar (21INR0021)

Green Holly Solar is a 413.6 MW solar interconnection project in Dawson, Texas with a current status of suspended. It is proposed to connect at tap 345kV 59900 Longdraw - 79641 Farmland.

413.6 MWCapacity
SuspendedStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameGreen Holly Solar
Queue ID21INR0021
Statussuspended
Source statussuspended
MarketERCOT
TechnologySolar
Capacity413.6 MW
StateTexas
CountyDawson
Point of interconnectiontap 345kV 59900 Longdraw - 79641 Farmland
Requested (queue) date2018-07-10
Proposed in-service date2026-05-30
Operational date
Withdrawn date
DeveloperCopenhagen Infrastructure Partners Fund IV
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata