Greens Bayou 9 CCGT (25INR0132)

Greens Bayou 9 CCGT is a 721.0 MW gas interconnection project in Harris, Texas with a current status of withdrawn. It is proposed to connect at Position 7 , Greens Bayou Substation, 40700.

721.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameGreens Bayou 9 CCGT
Queue ID25INR0132
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity721.0 MW
StateTexas
CountyHarris
Point of interconnectionPosition 7 , Greens Bayou Substation, 40700
Requested (queue) date
Proposed in-service date2025-07-01
Operational date
Withdrawn date2022-09-07
DeveloperNRG Energy, Inc.
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.