GRISEDALE STORAGE 1 (1762)

GRISEDALE STORAGE 1 is a 500.0 MW battery interconnection project in Riverside, California with a current status of withdrawn. It is proposed to connect at Devers Substation 230kV.

500.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameGRISEDALE STORAGE 1
Queue ID1762
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyBattery
Capacity500.0 MW
StateCalifornia
CountyRiverside
Point of interconnectionDevers Substation 230kV
Requested (queue) date2020-04-15
Proposed in-service date—
Operational date—
Withdrawn date2021-05-10
Developer—
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.