Grit DP-Perth 115 kV (AE2-292 - moved to TC1)

Grit DP-Perth 115 kV is a 127.0 MW solar interconnection project in Campbell, Virginia with a current status of withdrawn.

127.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGrit DP-Perth 115 kV
Queue IDAE2-292 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity127.0 MW
StateVirginia
CountyCampbell
Point of interconnection
Requested (queue) date2019-03-29
Proposed in-service date2021-04-01
Operational date
Withdrawn date2024-06-24
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata