Hallmark Solar is a 43.0 MW solar interconnection project in Hunt, Texas with a current status of withdrawn. It is proposed to connect at tap 69kV 1824 Neyland - 1826 Cadmil.

43.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameHallmark Solar
Queue ID18INR0056
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity43.0 MW
StateTexas
CountyHunt
Point of interconnectiontap 69kV 1824 Neyland - 1826 Cadmil
Requested (queue) date2016-12-14
Proposed in-service date2023-05-12
Operational date
Withdrawn date2023-10-19
DeveloperHallmark Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata