Harlingen Irrigation District 1 Solar (27INR0037)
Harlingen Irrigation District 1 Solar is a 54.3 MW solar interconnection project in Cameron, Texas with a current status of withdrawn. It is proposed to connect at The Rangerville (#80103) – Luna (#8656) 138 kV line; AEP.
54.3 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | Harlingen Irrigation District 1 Solar |
|---|---|
| Queue ID | 27INR0037 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 54.3 MW |
| State | Texas |
| County | Cameron |
| Point of interconnection | The Rangerville (#80103) – Luna (#8656) 138 kV line; AEP |
| Requested (queue) date | 2023-05-14 |
| Proposed in-service date | 2027-11-30 |
| Operational date | — |
| Withdrawn date | 2023-07-19 |
| Developer | Six Shooter Floating Solar LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata