Hebron North 115Kv substation (GEN-2021-106)

Hebron North 115Kv substation is a 102.1 MW solar interconnection project in Thayer, Nebraska with a current status of withdrawn. It is proposed to connect at Hebron North 115Kv substation.

102.1 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameHebron North 115Kv substation
Queue IDGEN-2021-106
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity102.1 MW
StateNebraska
CountyThayer
Point of interconnectionHebron North 115Kv substation
Requested (queue) date2021-05-20
Proposed in-service date2026-12-30
Operational date
Withdrawn date2024-09-16
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata