Thayer County, Nebraska — Interconnection Projects

The interXdata warehouse tracks 8 interconnection projects in Thayer, Nebraska, representing 484 MW of requested capacity.

8Total projects
0Active
4Operational
4Withdrawn
484 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind2217 MW
Solar3208 MW
Other358 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
North Hebron to Fairbury 115 kVGEN-2020-077Wind151.2 MWwithdrawnThayer, Nebraska
Carleton Junction 115 kV SubstationGEN-2023-040Solar105.0 MWwithdrawnThayer, Nebraska
Hebron North 115Kv substationGEN-2021-106Solar102.1 MWwithdrawnThayer, Nebraska
Hebron-Fairbury 115 kVGEN-2015-087Wind66.0 MWwithdrawnThayer, Nebraska
Hebron2266_1Other56.7 MWoperationalThayer, Nebraska
Deshler2234_5Other1.1 MWoperationalThayer, Nebraska
Deshler Solar68693_DESCHSolar1.0 MWoperationalThayer, Nebraska
Deshler2234_4Other0.6 MWoperationalThayer, Nebraska

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.