Hecate Solar (16INR0099)

Hecate Solar is a 33.0 MW solar interconnection project in Brewster, Texas with a current status of suspended. It is proposed to connect at tap 69kV 6653 Barilla - 6665 Alpine REA.

33.0 MWCapacity
SuspendedStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameHecate Solar
Queue ID16INR0099
Statussuspended
Source statussuspended
MarketERCOT
TechnologySolar
Capacity33.0 MW
StateTexas
CountyBrewster
Point of interconnectiontap 69kV 6653 Barilla - 6665 Alpine REA
Requested (queue) date2015-03-26
Proposed in-service date2020-12-31
Operational date
Withdrawn date
DeveloperHecate Energy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata