HIGHLINE SOLAR ENERGY CENTER (1513)

HIGHLINE SOLAR ENERGY CENTER is a 74.9 MW solar+battery interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Highwind Substation 230kV.

74.9 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameHIGHLINE SOLAR ENERGY CENTER
Queue ID1513
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity74.9 MW
StateCalifornia
CountyKern
Point of interconnectionHighwind Substation 230kV
Requested (queue) date2018-04-16
Proposed in-service date
Operational date
Withdrawn date2019-02-26
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.