HIGHWIND POWER PROJECT (922)

HIGHWIND POWER PROJECT is a 291.0 MW gas interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Highwind Substation 230kV.

291.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameHIGHWIND POWER PROJECT
Queue ID922
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity291.0 MW
StateCalifornia
CountyKern
Point of interconnectionHighwind Substation 230kV
Requested (queue) date2012-04-02
Proposed in-service date
Operational date
Withdrawn date2014-10-13
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.