Hornet Solar 2 LLC Cancelled (23INR0505)

Hornet Solar 2 LLC Cancelled is a 11.0 MW solar interconnection project in Swisher, Texas with a current status of withdrawn. It is proposed to connect at tap 345kV 23914 Tule Canyon - 23912 Ogallala.

11.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameHornet Solar 2 LLC Cancelled
Queue ID23INR0505
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity11.0 MW
StateTexas
CountySwisher
Point of interconnectiontap 345kV 23914 Tule Canyon - 23912 Ogallala
Requested (queue) date
Proposed in-service date2023-12-31
Operational date
Withdrawn date2022-06-14
DeveloperHornet Solar LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata