Hoskins 345 kV Substation via Turtle Creek 345 kV Substation (GEN-2023-216)

Hoskins 345 kV Substation via Turtle Creek 345 kV Substation is a 200.0 MW wind interconnection project in Knox And Cedar, Nebraska with a current status of withdrawn. It is proposed to connect at Hoskins 345 kV Substation via Turtle Creek 345 kV Substation.

200.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameHoskins 345 kV Substation via Turtle Creek 345 kV Substation
Queue IDGEN-2023-216
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity200.0 MW
StateNebraska
CountyKnox And Cedar
Point of interconnectionHoskins 345 kV Substation via Turtle Creek 345 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.