Jack Barton BESS (24INR0304)
Jack Barton BESS is a 47.3 MW battery interconnection project in Jack, Texas with a current status of withdrawn. It is proposed to connect at 1599 Barton Chapel Wind Farm station 138kV.
47.3 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Jack Barton BESS |
|---|---|
| Queue ID | 24INR0304 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 47.3 MW |
| State | Texas |
| County | Jack |
| Point of interconnection | 1599 Barton Chapel Wind Farm station 138kV |
| Requested (queue) date | 2022-08-04 |
| Proposed in-service date | 2027-04-13 |
| Operational date | — |
| Withdrawn date | 2025-12-18 |
| Developer | Jack Barton BESS |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.