Jade Solar (22INR0360)

Jade Solar is a 326.6 MW solar interconnection project in Scurry, Texas with a current status of operational. It is proposed to connect at tap 345kV 11305 Dermott - 59904 Cottonwood.

326.6 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameJade Solar
Queue ID22INR0360
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity326.6 MW
StateTexas
CountyScurry
Point of interconnectiontap 345kV 11305 Dermott - 59904 Cottonwood
Requested (queue) date2020-06-25
Proposed in-service date2023-12-22
Operational date2024-01-02
Withdrawn date
DeveloperIP RENEWABLE ENERGY HOLDINGS LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata