Juggernaut (20INR0277)

Juggernaut is a 100.0 MW other interconnection project in Waller, Texas with a current status of withdrawn. It is proposed to connect at 7670 Seaway 138kV.

100.0 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameJuggernaut
Queue ID20INR0277
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyOther
Capacity100.0 MW
StateTexas
CountyWaller
Point of interconnection7670 Seaway 138kV
Requested (queue) date2019-05-16
Proposed in-service date2020-12-31
Operational date
Withdrawn date2019-08-26
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata