Laramie River Station - Sidney 345kV (GEN-2016-034)
Laramie River Station - Sidney 345kV is a 90.0 MW wind interconnection project in Banner County, Nebraska with a current status of withdrawn. It is proposed to connect at Laramie River Station - Sidney 345kV.
90.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology
Project facts
| Canonical name | Laramie River Station - Sidney 345kV |
|---|---|
| Queue ID | GEN-2016-034 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | NE |
| Technology | Wind |
| Capacity | 90.0 MW |
| State | Nebraska |
| County | Banner County |
| Point of interconnection | Laramie River Station - Sidney 345kV |
| Requested (queue) date | 2016-03-31 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2020-12-07 |
| Developer | — |
| Utility / transmission owner | WAPA/BEPC/HCPD Integrated System |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata