Mansfield Landfill (69515_MNSFL)

Mansfield Landfill is a 1.8 MW solar interconnection project in Tolland, Connecticut with a current status of operational.

1.8 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameMansfield Landfill
Queue ID69515_MNSFL
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity1.8 MW
StateConnecticut
CountyTolland
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-06-01
Withdrawn date—
Developer—
Utility / transmission ownerNJR Clean Energy Ventures Corporation

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata