Maverick Creek I Wind is a 373.2 MW wind interconnection project in Concho, Texas with a current status of operational. It is proposed to connect at 7077 Amos Cr 345kV.

373.2 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameMaverick Creek I Wind
Queue ID20INR0045
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity373.2 MW
StateTexas
CountyConcho
Point of interconnection7077 Amos Cr 345kV
Requested (queue) date2018-01-04
Proposed in-service date2022-03-28
Operational date2022-03-29
Withdrawn date
DeveloperMaverick Creek Wind, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.