Maverick Creek Wind (62853_MVRCK)

Maverick Creek Wind is a 491.6 MW wind interconnection project in Concho, Texas with a current status of operational.

491.6 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical nameMaverick Creek Wind
Queue ID62853_MVRCK
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity491.6 MW
StateTexas
CountyConcho
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2022-03-01
Withdrawn date
Developer
Utility / transmission ownerAlgonquin Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata