MENIFEE POWER BANK (1645)

MENIFEE POWER BANK is a 680.0 MW battery interconnection project in Riverside, California with a current status of operational. It is proposed to connect at Valley Substation 500kV.

680.0 MWCapacity
OperationalStatus
EasternMarket
BatteryTechnology

Project facts

Canonical nameMENIFEE POWER BANK
Queue ID1645
Statusoperational
Source statusCOMPLETED
MarketEastern
TechnologyBattery
Capacity680.0 MW
StateCalifornia
CountyRiverside
Point of interconnectionValley Substation 500kV
Requested (queue) date2019-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-18statusactiveoperationalhigh
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.