Mill Creek SW Station 138 kV (J2976)

Mill Creek SW Station 138 kV is a 50.0 MW solar interconnection project in Jasper, Texas with a current status of withdrawn. It is proposed to connect at Mill Creek SW Station 138 kV.

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMill Creek SW Station 138 kV
Queue IDJ2976
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StateTexas
CountyJasper
Point of interconnectionMill Creek SW Station 138 kV
Requested (queue) date2022-09-15
Proposed in-service date2025-05-31
Operational date2025-05-31
Withdrawn date2025-07-31
Developer
Utility / transmission ownerEAST TEXAS ELECTRIC COOPERATIVE, INC.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.