Mineral Wells East BESS (23INR0570)

Mineral Wells East BESS is a 9.9 MW other interconnection project in Palo Pinto, Texas with a current status of operational. It is proposed to connect at MINWLLSE1_8/1584/LDLXFMR1.

9.9 MWCapacity
OperationalStatus
ERCOTMarket
OtherTechnology

Project facts

Canonical nameMineral Wells East BESS
Queue ID23INR0570
Statusoperational
Source statusoperational
MarketERCOT
TechnologyOther
Capacity9.9 MW
StateTexas
CountyPalo Pinto
Point of interconnectionMINWLLSE1_8/1584/LDLXFMR1
Requested (queue) date2023-01-24
Proposed in-service date2024-02-17
Operational date2024-02-16
Withdrawn date
DeveloperHEN Infrastructure, LLC 1
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata