MISO Queue Project G407 — Gas in Blue Earth, Minnesota is a 667.0 MW gas interconnection project in Blue Earth, Minnesota with a current status of withdrawn. It is proposed to connect at Unknown.

667.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project G407 — Gas in Blue Earth, Minnesota
Queue IDG407
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity667.0 MW
StateMinnesota
CountyBlue Earth
Point of interconnectionUnknown
Requested (queue) date2004-02-20
Proposed in-service date2004-11-01
Operational date
Withdrawn date2006-02-02
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.