MISO Queue Project G616 — Wind in Benton, Indiana

MISO Queue Project G616 — Wind in Benton, Indiana is a 120.0 MW wind interconnection project in Benton, Indiana with a current status of withdrawn. It is proposed to connect at Goodland - Watseka 138 kV.

120.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project G616 — Wind in Benton, Indiana
Queue IDG616
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity120.0 MW
StateIndiana
CountyBenton
Point of interconnectionGoodland - Watseka 138 kV
Requested (queue) date2006-04-04
Proposed in-service date2007-10-01
Operational date
Withdrawn date2007-07-06
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.