MISO Queue Project J250 — Gas in Shelby, Indiana

MISO Queue Project J250 — Gas in Shelby, Indiana is a 999.0 MW gas interconnection project in Shelby, Indiana with a current status of withdrawn. It is proposed to connect at Prescott 345 kV Substation.

999.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J250 — Gas in Shelby, Indiana
Queue IDJ250
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity999.0 MW
StateIndiana
CountyShelby
Point of interconnectionPrescott 345 kV Substation
Requested (queue) date2012-08-28
Proposed in-service date
Operational date
Withdrawn date2014-04-08
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata