MISO Queue Project J431 — Wind in Benton, Indiana

MISO Queue Project J431 — Wind in Benton, Indiana is a 100.0 MW wind interconnection project in Benton, Indiana with a current status of operational. It is proposed to connect at Goodland 138 / 69 kV substation.

100.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J431 — Wind in Benton, Indiana
Queue IDJ431
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity100.0 MW
StateIndiana
CountyBenton
Point of interconnectionGoodland 138 / 69 kV substation
Requested (queue) date2014-12-16
Proposed in-service date2017-09-01
Operational date2017-09-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata