North Hebron to Fairbury 115 kV (GEN-2020-077)

North Hebron to Fairbury 115 kV is a 151.2 MW wind interconnection project in Thayer, Nebraska with a current status of withdrawn. It is proposed to connect at North Hebron to Fairbury 115 kV.

151.2 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameNorth Hebron to Fairbury 115 kV
Queue IDGEN-2020-077
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity151.2 MW
StateNebraska
CountyThayer
Point of interconnectionNorth Hebron to Fairbury 115 kV
Requested (queue) date2020-04-28
Proposed in-service date2025-10-31
Operational date
Withdrawn date2024-03-08
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata