NORTH SKY RIVER WIND (132)

NORTH SKY RIVER WIND is a 162.0 MW wind interconnection project in Kern, California with a current status of operational. It is proposed to connect at Highwind Substation 230kV bus.

162.0 MWCapacity
OperationalStatus
NorthernMarket
WindTechnology

Project facts

Canonical nameNORTH SKY RIVER WIND
Queue ID132
Statusoperational
Source statusCOMPLETED
MarketNorthern
TechnologyWind
Capacity162.0 MW
StateCalifornia
CountyKern
Point of interconnectionHighwind Substation 230kV bus
Requested (queue) date2006-09-27
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata