Olmito BESS (25INR0649)
Olmito BESS is a 10.0 MW battery interconnection project in Cameron, Texas with a current status of active. It is proposed to connect at Station Name: OLMITO Load Name or Load Transformer name: LD1 Bus#: 8950 Voltage: 138kV.
10.0 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Olmito BESS |
|---|---|
| Queue ID | 25INR0649 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 10.0 MW |
| State | Texas |
| County | Cameron |
| Point of interconnection | Station Name: OLMITO Load Name or Load Transformer name: LD1 Bus#: 8950 Voltage: 138kV |
| Requested (queue) date | — |
| Proposed in-service date | 2026-02-26 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Aggreko MSR Grid PC5 |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.