Palacios Bay Energy Storage (25INR0544)
Palacios Bay Energy Storage is a 101.2 MW battery interconnection project in Matagorda, Texas with a current status of withdrawn. It is proposed to connect at Tap 138kV #8115 WADSWORT4A - #8139 CELNEBC4B.
101.2 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Palacios Bay Energy Storage |
|---|---|
| Queue ID | 25INR0544 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 101.2 MW |
| State | Texas |
| County | Matagorda |
| Point of interconnection | Tap 138kV #8115 WADSWORT4A - #8139 CELNEBC4B |
| Requested (queue) date | 2023-10-18 |
| Proposed in-service date | 2028-12-31 |
| Operational date | — |
| Withdrawn date | 2025-11-21 |
| Developer | Palacios Bay Energy Storage, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.