Point Mountain Solar (22INR0236)

Point Mountain Solar is a 514.0 MW solar interconnection project in Crane, Texas with a current status of withdrawn. It is proposed to connect at 76000 North McCamey 345kV.

514.0 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical namePoint Mountain Solar
Queue ID22INR0236
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity514.0 MW
StateTexas
CountyCrane
Point of interconnection76000 North McCamey 345kV
Requested (queue) date2019-08-25
Proposed in-service date2024-12-14
Operational date
Withdrawn date2022-07-07
DeveloperHecate Energy
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.