QUARTZ 9 (1297)

QUARTZ 9 is a 153.4 MW solar interconnection project in Riverside, California with a current status of withdrawn. It is proposed to connect at Colorado River 230 kV SUB.

153.4 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameQUARTZ 9
Queue ID1297
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity153.4 MW
StateCalifornia
CountyRiverside
Point of interconnectionColorado River 230 kV SUB
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2017-03-09
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata