Radian Increase (21INR0307)

Radian Increase is a 61.2 MW solar interconnection project in Brown, Texas with a current status of withdrawn. It is proposed to connect at 1444 Brown 345kV.

61.2 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameRadian Increase
Queue ID21INR0307
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity61.2 MW
StateTexas
CountyBrown
Point of interconnection1444 Brown 345kV
Requested (queue) date2019-05-01
Proposed in-service date2021-05-31
Operational date
Withdrawn date2019-08-06
DeveloperIP Radian, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata