REDONDA (2036)

REDONDA is a 250.0 MW solar+battery interconnection project in Riverside, California with a current status of active. It is proposed to connect at Red Bluff Substation 220 kV.

250.0 MWCapacity
ActiveStatus
EasternMarket
Solar+BatteryTechnology

Project facts

Canonical nameREDONDA
Queue ID2036
Statusactive
Source statusACTIVE
MarketEastern
TechnologySolar+Battery
Capacity250.0 MW
StateCalifornia
CountyRiverside
Point of interconnectionRed Bluff Substation 220 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.