ROSE MEADOW WIND BANK (1075)

ROSE MEADOW WIND BANK is a 50.0 MW battery interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Whirlwind 230kV bus.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameROSE MEADOW WIND BANK
Queue ID1075
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity50.0 MW
StateCalifornia
CountyKern
Point of interconnectionWhirlwind 230kV bus
Requested (queue) date2014-04-30
Proposed in-service date
Operational date
Withdrawn date2015-04-01
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.