SAND CANYON CREEK (653EF)

SAND CANYON CREEK is a 20.0 MW solar interconnection project in Kern, California with a current status of withdrawn. It is proposed to connect at Cal Cement-Monolith-Windland 66 kV.

20.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSAND CANYON CREEK
Queue ID653EF
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity20.0 MW
StateCalifornia
CountyKern
Point of interconnectionCal Cement-Monolith-Windland 66 kV
Requested (queue) date2010-10-05
Proposed in-service date
Operational date
Withdrawn date2012-03-03
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata