Sheep Creek Wind (21INR0325)

Sheep Creek Wind is a 153.0 MW wind interconnection project in Callahan, Texas with a current status of operational. It is proposed to connect at 68051 Reata 345kV_x000D_ .

153.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameSheep Creek Wind
Queue ID21INR0325
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity153.0 MW
StateTexas
CountyCallahan
Point of interconnection68051 Reata 345kV_x000D_
Requested (queue) date2019-05-29
Proposed in-service date2024-10-15
Operational date2023-11-17
Withdrawn date
DeveloperCentury Oak Wind Project, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata